information

Brief Information and Introduction to Our Green Energy Generator

  1. World’s First Green Energy Generator
    ○ Our generator is the first of its kind, operating without consuming fuel oil and
    producing nearly zero noise.
    ○ Unlike conventional generators that rely on fuel oil for electricity production, our
    technology offers a revolutionary alternative.
    ○ The patent for this unique technology belongs to us.
  2. Proven Track Record
    ○ Over the past two years, we have successfully manufactured and sold our
    generators internationally, gaining valuable experience.
    ○ Our generators have been sold in Germany, Iraq, and Kyrgyzstan.
  3. Unique Technology
    ○ Instead of using fuel oil, our patented technology operates with a mix of five
    different gases such as xenon, helium, and others.
    ○ These gases are combined and placed into our generators, which then begin
    producing electricity efficiently.
  4. 24/7 Operation
    ○ Once the mixed gases are loaded, the generator runs continuously, producing
    electricity 24 hours a day, 365 days a year.
    ○ Unlike wind, solar, or hydropower plants, which depend on weather conditions,
    our generator offers consistent power output.
  5. Maintenance Requirements
    ○ Maintenance is required twice a year, during which the generator is stopped for
    8 hours to refill gas if needed.
    ○ The estimated cost for each maintenance session is approximately $30,000.
  6. Production and Commercial Aspects
    ○ Production Cost per Generator: $1.3 million
    ○ Selling Price per Generator: $4.3 million
    ○ Annual Production Target: 5,000 generators, each with a power output of 4.2
    MW.
    ○ Projected Annual Profit:
    ■ Total production cost: $6.5 billion (5,000 units x $1.3 million each).
    ■ Total sales revenue: $21.5 billion (5,000 units x $4.3 million each).
    ■ Net profit: $15 billion annually.
  7. Patent and Investment Opportunities
    ○ The price for our patented technology will depend on negotiations.
    ○ Options include selling 100% of our stake or 70% of our stake, based on
    mutual agreement.
  8. Production Process
    ○ Production requires a 3,000 sq. meter closed facility, with a height of 10 meters
    and an additional 500 sq. meters for offices.
    ○ The assembly process involves:
    ■ Constructing a container (similar to a 20-ft container).
    ■ Installing the machinery inside.
    ○ Time required per generator: 1 week with 3 workers.
  9. Simplified Manufacturing
    ○ Alternatively, we can outsource the container assembly and focus solely on
    installing the machinery. This process takes 3 days with 2 workers.
  10. Key Components for Each Generator
    ○ 24 Inventors
    ○ 12 Large Gas Balloons
    ○ 12 Small Gas Balloons
    ○ 1 Westinghouse Regulator
    ○ 1 Electric Box
    ○ Other small electrical components
    ○ Proprietary know-how and patent.
  11. Global Demand
    ○ Potential markets include Africa, Europe, USA, Canada, and Asia.
    ○ Our generators are expected to meet worldwide demand due to their affordability,
    reliability, ease of maintenance, and alignment with global green energy policies.
  12. Future Vision
    ○ With professional management, our company is poised to become the global
    leader in green energy generators within the next five years.
    Best regards,
    Jamal