Brief Information and Introduction to Our Green Energy Generator
- World’s First Green Energy Generator
○ Our generator is the first of its kind, operating without consuming fuel oil and
producing nearly zero noise.
○ Unlike conventional generators that rely on fuel oil for electricity production, our
technology offers a revolutionary alternative.
○ The patent for this unique technology belongs to us. - Proven Track Record
○ Over the past two years, we have successfully manufactured and sold our
generators internationally, gaining valuable experience.
○ Our generators have been sold in Germany, Iraq, and Kyrgyzstan. - Unique Technology
○ Instead of using fuel oil, our patented technology operates with a mix of five
different gases such as xenon, helium, and others.
○ These gases are combined and placed into our generators, which then begin
producing electricity efficiently. - 24/7 Operation
○ Once the mixed gases are loaded, the generator runs continuously, producing
electricity 24 hours a day, 365 days a year.
○ Unlike wind, solar, or hydropower plants, which depend on weather conditions,
our generator offers consistent power output. - Maintenance Requirements
○ Maintenance is required twice a year, during which the generator is stopped for
8 hours to refill gas if needed.
○ The estimated cost for each maintenance session is approximately $30,000. - Production and Commercial Aspects
○ Production Cost per Generator: $1.3 million
○ Selling Price per Generator: $4.3 million
○ Annual Production Target: 5,000 generators, each with a power output of 4.2
MW.
○ Projected Annual Profit:
■ Total production cost: $6.5 billion (5,000 units x $1.3 million each).
■ Total sales revenue: $21.5 billion (5,000 units x $4.3 million each).
■ Net profit: $15 billion annually. - Patent and Investment Opportunities
○ The price for our patented technology will depend on negotiations.
○ Options include selling 100% of our stake or 70% of our stake, based on
mutual agreement. - Production Process
○ Production requires a 3,000 sq. meter closed facility, with a height of 10 meters
and an additional 500 sq. meters for offices.
○ The assembly process involves:
■ Constructing a container (similar to a 20-ft container).
■ Installing the machinery inside.
○ Time required per generator: 1 week with 3 workers. - Simplified Manufacturing
○ Alternatively, we can outsource the container assembly and focus solely on
installing the machinery. This process takes 3 days with 2 workers. - Key Components for Each Generator
○ 24 Inventors
○ 12 Large Gas Balloons
○ 12 Small Gas Balloons
○ 1 Westinghouse Regulator
○ 1 Electric Box
○ Other small electrical components
○ Proprietary know-how and patent. - Global Demand
○ Potential markets include Africa, Europe, USA, Canada, and Asia.
○ Our generators are expected to meet worldwide demand due to their affordability,
reliability, ease of maintenance, and alignment with global green energy policies. - Future Vision
○ With professional management, our company is poised to become the global
leader in green energy generators within the next five years.
Best regards,
Jamal